Facilities / LyondellBasell MoReTec-2 commercial-scale pyrolysis facility, Houston

LyondellBasell MoReTec-2 commercial-scale pyrolysis facility, Houston

AI-found Facility identity not yet checked by an admin.

Facility info

FieldValueSource
LocationHouston, TXInferred from a news reportReasoning: Resource Recycling says LyondellBasell's idled refinery site in Houston, Texas had been considered as the location for the MoReTec-2 plant.Resource Recycling: LYB looks to EU for chem recycling growth ↗Recorded in report 2026-11-09-watchlist
OperatorLyondellBasellInferred from a news reportReasoning: On LyondellBasell's own Q3 2026 earnings call, CEO Peter Vanacker discusses MoReTec-2 as the company's project.LyondellBasell (LYB) Q3 2026 earnings call transcript ↗Recorded in report 2026-11-01-sweep
Facility typepyrolysisInferred from a news reportReasoning: Resource Recycling's article on MoReTec, headlined as LyondellBasell's catalytic pyrolysis process, says a larger MoReTec 2 unit could be built from the Houston refinery's assets.Resource Recycling: Polyolefins producer details its catalytic pyrolysis process ↗Recorded in report 2026-11-09-fact-sources
StageDelayedInferred from a news reportReasoning: On the 2026-10-30 call the CEO said the MoReTec-2 final investment decision was delayed and the US lacks the regulatory support to enable it: an unbuilt project that has stalled.LyondellBasell (LYB) Q3 2026 earnings call transcript ↗Recorded in report 2026-11-01-sweep
First report mention2026-08-30A scheduled AI sweep first mentioned this facility in this report.Recorded in report 2026-08-30-watchlist

EPA values come from the EPA snapshot 20261101_090957 and are shown in place of anything an AI sweep reported for the same field. AI-found values were found in public sources by scheduled AI sweeps; the token opens where the value was found: the passage quoted from the source or the reasoning behind the value, the source, and the report that recorded it. Quotes are copied by the AI and not yet checked against their sources.

Published data

No EPA records are linked to this facility yet: the facility registry has no EPA registry id for it.

Rolling updates

Scheduled AI sweeps of public sources find the stage, deadlines, and sources below, and an AI writes the summary from them. They may not be comprehensive. Check the linked sources before relying on any of it. About the data

Summary from the latest report mention, AI-written

Stage Delayed Inferred from a news reportReasoning: On the 2026-10-30 call the CEO said the MoReTec-2 final investment decision was delayed and the US lacks the regulatory support to enable it: an unbuilt project that has stalled.LyondellBasell (LYB) Q3 2026 earnings call transcript ↗Recorded in report 2026-11-01-sweep

  • No new US site announcement Aug 1 to Sep 3. MoReTec-2 Houston final investment decision not announced; LyondellBasell wrote down its Cyclyx stake.
  • Company said in August it is permitting a commercial-scale pyrolysis facility in Houston (08-30 brief); watch TCEQ filings.
  • Q3 2026 earnings call (2026-10-30), CEO Peter Vanacker: 'we delayed the final investment decision for MoReTec-2 last year'; 'In the U.S., we do not yet see strong regulatory support that would eventually enable an investment in MoReTec-2.' Only MoReTec-1 (Wesseling, Germany, 'semi-industrial') is advancing. An analyst asked whether MoReTec-2 is 'pushed further to the right or potentially canceled'; the reply set no date.
  • Same call: LyondellBasell is selling 'the site of the former Houston refinery' to Valero for $320.5 million, expected to close by end of 2026. Earlier company statements placed MoReTec-2 at that Houston site (prior knowledge, not re-verified this run). If so, the sale removes the site. Treat Houston MoReTec-2 as delayed, possibly abandoned.
  • Resource Recycling (2026-11-02), reporting the 10-30 call: LyondellBasell now expects to build MoReTec-2 in Europe, only after MoReTec-1 in Wesseling, Germany starts up; US development would depend on demand and regulatory progress. The idled Houston refinery site, which had been considered for MoReTec-2, is being sold. No company statement that Houston is cancelled, so the stage stays delayed; watch for a formal cancellation.

From report 2026-11-09-watchlist

Open deadlines

None found.

Sources (3) AI-found

Date foundKindTitleNoteReport
2026-11-09newsResource Recycling: LYB looks to EU for chem recycling growth2026-11-02. MoReTec-2 now expected in Europe after MoReTec-1 start-up; Houston refinery site that had been considered for it is being sold.2026-11-09-watchlist
2026-11-09newsResource Recycling: Polyolefins producer details its catalytic pyrolysis process2023-10-17. MoReTec catalyst process; LyondellBasell to decide on repurposing Houston refinery assets for a 100,000 t/yr MoReTec 2. Found by the fact-sources backfill.2026-11-09-fact-sources
2026-11-01newsLyondellBasell (LYB) Q3 2026 earnings call transcriptVanacker: MoReTec-2 FID delayed; no strong US regulatory support; Houston refinery site sale to Valero $320.5M.2026-11-01-sweep