Reports / 2026-11-12 · sweep

Early-Warning Sweep — 2026-11-12

AI-written

This report was written by a scheduled AI sweep of public sources. It may contain errors; check the sources it links before relying on it.

Window: 2026-11-08 to 2026-11-12. The canonical docs (lexicon, channel map plus run additions) and the coverage log (102 rows) were readable. Every item below was dedupe-checked against the log.

Lead item: Ohio EPA final-issued Alterra Energy’s renewal air permit P0133062 (Akron, Summit County; plastics pyrolysis, 5,000 lb/hr) with an action date of 2026-11-10. This ends about four years on the expired 2012 permit. It opens a 30-day appeal to the Environmental Review Appeals Commission. On the earliest reading the deadline is 2026-12-10 (28 days). Two other windows are open: ADEM scrap tire rule hearing, 2026-11-19 (7 days, URGENT), and Empire Green Generation, Follansbee WV, draft R13-3555B, comments by 2026-11-30 (18 days). No net-new facility surfaced.


1. DEADLINE INSIDE 30 DAYS

URGENT, 7 days (adjacent rulemaking): ADEM Scrap Tire Program rule, Div. 335-4 (Public Notice 423), Alabama

  • Status: carried forward, no change.
  • Hearing: 2026-11-19, 10:00 am, ADEM Main Hearing Room, 1400 Coliseum Blvd, Montgomery.
  • Comments: written comments by 5:00 pm 11-19 to hearing.officer@adem.alabama.gov.
  • Relevance: “Processed Tire Material” is defined to include any “thermal process”, and the rule names no pyrolysis. Two tracked Alabama tire pyrolysis sites: Eco Infinic Phenix City and Alabama Renewable Energy Montgomery.
  • Source: https://adem.alabama.gov/sites/default/files/2026-09/09-26div4-rules.pdf
  • Next step: if an Alabama partner is commenting, draft it now and file by 11-18.

18 days: Empire Green Generation LLC, 801 Koppers Road, Follansbee, Brooke County, WV

  • Agency: WVDEP Division of Air Quality, NSR.
  • Permit: draft R13-3555B, Facility ID 009-00141, permit writer Edward Andrews.
  • Stage: preliminary determination to issue.
  • Dates: received 03/27/2026; DAQ public notice date 10/30/2026; “Last Day to Comment” 11/30/26 (sheet re-read 2026-11-12, row unchanged).
  • Deadline: “before 5:00 p.m. on Monday, November 30, 2026”. 18 days remaining. The up-to-90-day WV statutory review runs separately.
  • Hearing: none listed. A public meeting can still be requested.
  • Comments to: daqpubliccomments@wv.gov, subject “Empire Comments”; Edward Andrews P.E., 601 57th St SE, Charleston WV 25304, (304) 926-0499 ext. 41244.
  • OGW: listed On Hold; this action not recorded. Share with EIP.
  • New this run: search engines now index two more documents in the DAQ Empire folder, “EPA Response RE - WV Regulatory Interpretation Request.pdf” and “Empire Green_WVDEP RI_Aug2025.pdf”. A search snippet describes the EPA response as treating WVDEP’s October 2024 section 129 request “as a request for clarification of Subpart CCCC rather than a formal determination”. Reported, not confirmed: both files returned HTTP 404 on dep.wv.gov and dep-auth.wv.gov.
  • Sources:
  • Next step: ask DAQ (Andrews) or Fair Shake for the EPA response letter and the August 2025 WVDEP regulatory-interpretation document before 11-30. Both bear on whether the pyrolysis trains are section 129 units. Request a public meeting in the same email.

28 days (earliest reading): APPEAL WINDOW, Alterra Energy, LLC, 1200 East Waterloo Road, Akron, Summit County, OH

  • Agency: Ohio EPA, Division of Air Pollution Control, with the Akron Regional Air Quality Management District as local agency.
  • Permit: renewal PTIO P0133062, Facility ID 1677011258, “Plastics Recycling Unit 1 (plastics-to-pyrolysis oil unit) with a maximum capacity of 5,000 pounds per hour of plastics feed”. It uses a pyrolysis kiln, an extruder, product condensers and an enclosed vapor combustion unit (VCU).
  • Stage: Final Issuance of Permit-To-Install and Operate. Action date Nov 10, 2026 (notices DB, notice 225909). No Weekly Review date had been assigned as of 11-12. It will most likely appear on the 11-16 Weekly Review.
  • History: original PTIO P0122408 issued 2012, expired 2022-10-16. Renewal application A0072225 (2022-10-15). Draft 2025-04-18; hearing 2025-05-28; comments closed June 2025 (Signal Akron reported an extension to June 18). The plant ran about four years on the expired permit.
  • Deadline: an appeal to the Environmental Review Appeals Commission must be filed “within thirty (30) days after notice of the Director’s action” (ORC 3745.04). Notice of the filing goes to the Director within 3 days, and Ohio EPA asks that a copy go to the Attorney General’s Environmental Enforcement Section.
    • Counted from the 11-10 action date, the deadline is 2026-12-10, 28 days.
    • Publication on the Weekly Review or in a newspaper may start a later clock for non-parties. Do not rely on that; plan on 12-10.
    • Standing depends on objections raised in the 2025 comment period, so check who filed comments then.
  • Where appeals go: the Environmental Review Appeals Commission, Columbus (confirm the current filing address on the ERAC site; one Ohio EPA notice excerpt gives 30 East Broad St., 4th Floor). Local contact: Laura Miracle, Akron Regional AQMD, 1867 West Market St., Akron OH 44313, (330) 375-2480, lmiracle@schd.org. Ohio EPA Hearing Clerk: HClerk@epa.ohio.gov, 614-644-3037.
  • OGW: listed (facility 5859, Operating). EIP last recorded P0133062 as “Draft Issued” (checked 2025-11-21, per the 10-15 read). This final issuance is presumably not recorded; OGW was not re-read this run. Share with EIP.
  • How surfaced: Ohio EPA notices DB, Thursday Action Date search (11/08 to 11/12, State “”), read in the browser.
  • Not yet read: the final permit terms (expiration date, feed limit, any change from the 2025 draft, which cut the hourly feed limit from 6,250 to 5,000 lb).
  • Sources:
  • Next step:
    • Today: tell the Akron partners (Big Love Network, Moms Clean Air Force Ohio) and EIP.
    • Pull the final permit and the response-to-comments document in Ohio EPA eDocument Search (P0133062).
    • Decide on an ERAC appeal by early December, and log the new permit’s expiration date for the renewal calendar.

2. NET-NEW FACILITIES

None this window. Searches covered pyrolysis and tire-pyrolysis proposals, hearings and zoning fights; “advanced recycling” hearings; Subpart AAAA / “plastics or rubber recycling unit”; newswires; and Resource Recycling and Recycling Today front pages since 11-06. They returned only:

  • non-US items: the Aduro pilot (Ontario) and Pyrum and Tyregen (Europe);
  • old coverage: Encina 2024, the Clean-Seas August permit and the Grace 2025 approval;
  • items already logged.

The only new scope screens came from agency enumeration (Section 4), and none were in scope.


3. CHANGES ON KNOWN FACILITIES

Alterra Energy, Akron OH: renewal PTIO P0133062 FINAL (2026-11-10)

See Section 1 for the full block. The stage stays operating; a renewal at an operating plant does not change the stage. Facility file updated with the new source, two summary bullets and the 12-10 appeal deadline.

Renewal calendar (from the log, expiring within 12 months)

  • Alterra Akron: resolved. P0122408 (expired 2022-10-16) is replaced by final P0133062. The new expiration date is not yet captured; pull it from the final permit.
  • No other logged permit expiration falls before 2027-11.

Standing watches, no change

  • Reju Rochester: NYSDEC ENB 11-11 issue, Region 8 notices read. No Reju, Technip or Eastman Business Park item.
  • Waste Energy Fayetteville NC: NC DEQ combined notices, page 1 of 5 read. No Cumberland or Waste Energy item.
  • Waste Energy Midland TX: no release since 11-03. Investor call 11-17; commissioning target 12-01.
  • Synthesia Stillwater 2026-0031-C: the ODEQ grid still shows “Comment Review (06/26/2026 - 09/24/2026)”. No final.
  • W.R. Grace Columbia: no MDE amendment notice or news found.
  • BurCell Martinsburg R13-3795: the “1/1/2027” seen on 11-08 is the sheet’s Proposed Start-Up Date column, not a notice date. Still no DAQ public notice date.
  • Enviro Recycling Kingsbury IN: window closed 11-07. The IDEM list (updated 11-10) still shows the draft entry; no final yet.
  • Conversion Energy (Houston) gasifier auction: webcast auction 11-12 10 a.m. CT. No result found yet; watch for the buyer.

4. JURISDICTIONS ENUMERATED THIS RUN

  • Ohio EPA (CONFIRMED): notices DB in the browser. Action Date 11/08 to 11/12/2026, State “”, Weekly Review dates cleared.
    • 90 notices; 35 air rows (Program filter, Show All Rows). All screened by name and notice type.
    • Opened: Alterra Energy (P0133062, final issuance, in scope); Washington Penn Plastics, Wapakoneta, A0083047 (dust collector replacement on a compounding line; out of scope).
    • Screened by name, not opened: Plymouth Foam Title V application and POLYSOURCE / Epsilyte application (EPS resin and foam makers), CMH232 Campus draft PTI (data center).
  • Indiana IDEM (CONFIRMED): all-regions list, updated 11/10/2026.
    • New air drafts: Re-Gen Inc. (Elkhart, M039-50728-02045), Modern Materials (Fulton, metal-parts coating renewal), Smyrna Ready Mix, H-E Parts.
    • The Re-Gen draft (read through r.jina.ai) is a mechanical polyethylene shredding, grinding and pelletizing plant (SIC 5093), built before it was permitted. Out of scope; logged so the plastics-recycling hit is accounted for. Comments 11/09 to 12/09.
    • Water notices screened by name: none in scope. No land notices since 11-05.
  • West Virginia DEP DAQ (NSR sheet): CSV read through r.jina.ai, 87 data rows.
    • New since 11-08: Tiger Diversified quarry GP, Alliant Techsystems R13-3186H, Maverick Energy and Howard Concrete PD permits, DTM Appalachia GP.
    • New notice dates: Antero Belford (11-04), Constellium Ravenswood (11-06), Buckeye Stone (11-05), McElroy 7W1 (12-04). None in scope.
  • Oklahoma ODEQ: WebFetch summary, not the browser. 295 records (AQD 180, WQD 107, LPD 8; unverified tallies). No Public Commenting Period starting after 11-03. Keyword rows: Synthesia, Interplastic, Goodyear Lawton WQD, Georg Fischer; none new in scope.
  • Texas TCEQ pending NSR list: read A to Z through r.jina.ai in three parts. No Waste Energy, Abundia, Cyclyx, New Hope, Braven, LyondellBasell, InnoVent, Conversion Energy or PXA entry. Eastman 30130 / 20489 and ExxonMobil Baytown 20211 were already seen.
  • Georgia EPD: no advisory after PA 1126-1 / 1126-1a (11-04).
  • Arizona Pinal County AQCD: /401 read through r.jina.ai. The same 9 notices as 11-08, none in scope (Prowall polystyrene foam V20724 is product manufacturing). /418 not attempted.
  • Michigan EGLE: NSR “PTIs Open for Comment” Rev. 11/09/2026, read through r.jina.ai. Three items (Hydro Aluminum, Citgo, J.H. Campbell coal ash). None in scope.
  • New York NYSDEC ENB: 11-11 and 11-04 issues, Region 8 notices. None in scope.
  • North Carolina DEQ: combined notices, page 1 of 5 only. None in scope. Pages 2–5 not read.
  • Federal Register: API term “pyrolysis”, published on or after 2026-11-07: 0 documents.
  • Not read this run (do not read as clear):
    • PA Bulletin: no new issue since 56-45 (11-07); next issue 11-14.
    • Texas Register “In Addition”: the 11-13 issue is not yet posted.
    • Pinal /418, Maricopa “All Apps”, Kentucky, California (CalRecycle, BAAQMD), Tennessee TDEC, Maryland MDE, NJ, SC, Louisiana, Nevada, Oil & Gas Watch.

5. CHANNEL STATUS CHANGES

  • No review date came due. The next is the Texas Register “In Addition” (PROVISIONAL) on 2026-12-10.
  • No new provisional channels.
  • The eleven v1.0 outcomes recorded on 2026-11-05 still await the owner.
  • Readability notes added to the run additions:
    • Ohio final-issuance notices reuse the draft text, so read the Notice Type field.
    • The WV sheet’s “1/1/2027” for BurCell is a proposed start-up date.
    • Michigan’s PDF is now Rev. 11/09 and reads only through the proxy.
    • The NYSDEC ENB index is readable with a plain fetch.

6. MOVEMENT ON KNOWN FIGHTS

  • Alterra Akron: renewal P0133062 final 11-10; appeal clock running (Section 1).
  • Empire Follansbee: comment window open, 18 days. An EPA response on section 129 is indexed but offline.
  • C&EN “Uncovered” podcast (11-09): the reporters say there are “only three operating pyrolysis facilities in the US” (unnamed). Alterra Akron “refused an interview”; Brightmark ran “at only 5% of capacity”; Ohio EPA told Freepoint it was not meeting the section 129 exemption criteria. Context only. https://cen.acs.org/environment/pollution/uncovered-plastic-pyrolysis/104/web/2026/11
  • Waste Energy Midland: investor call 11-17; commissioning target 12-01.

Yield: 3 coverage rows. That is 1 lead (a permit action on a known facility: the Alterra P0133062 final issuance and its appeal window), 0 net-new facilities, 1 out-of-scope accounting row (Re-Gen) and 1 context row (C&EN). Changes on known facilities: 1. Jurisdictions enumerated: Ohio, Indiana, West Virginia, Oklahoma, Texas (TCEQ NSR), Georgia, Pinal County AZ, Michigan, NYSDEC, North Carolina (partial), Federal Register.

PROCESS NOTE

  1. Ohio final-issuance notices reuse the draft text. The Alterra final shows the 2025 hearing and comment dates in its Notice Info. Only the Notice Type field says “Final Issuance”. A text-only screen would misread it as an old draft. The weekly Ohio read should also flag “Final Issuance” rows for tracked facilities, because each one starts an ERAC appeal clock. Recorded in the channel-map additions.
  2. The ERAC appeal clock is not in the canonical docs. The lexicon’s Rule 7 and the Ohio channel entry cover the comment clock only. Suggest the owner add: ERAC appeal “within thirty (30) days after notice of the Director’s action” (ORC 3745.04), and confirm with counsel whether a non-party’s clock runs from the action date or from Weekly Review publication.
  3. The Empire EPA-response documents are indexed but return 404. The same happened on 11-08 with the Fair Shake letter. A partner request to DAQ is the only route before 11-30.
  4. Oil & Gas Watch was not read (browser time went to Ohio). The OGW status for Alterra is from the 10-15 read.
  5. The browser’s find tool was not permitted in this run, and snapshots cannot be saved to disk. Large pages (the Ohio search form) had to be read through the oversized-result file. A scoped snapshot (target = the results table) works and should be the default.
  6. No quote subagents were run. No new facility, stage change or replaced fact source was staged.