Reports / 2026-09-03 · sweep

Pyrolysis / Dangerous Plastics Facilities — Early-Warning Sweep September 3 2026

Each block below is self-contained and can be forwarded as-is. Sources sit inside the block they belong to. ————————

1. DEADLINE INSIDE 30 DAYS

URGENT — Clean-Seas West Virginia, Inc. (Clean Vision Corp, OTC: CLNV) — Belle, Kanawha County, WV — APPEAL CLOCK, ~8 DAYS

2. NET-NEW FACILITIES — not in the coverage log

Texas InnoVent Renewables Inc. (“TIRES Inc”) / InnoVent Renewables — near Houston, TX (county not disclosed) — NOT IN OGW — share with EIP

W.R. Grace & Co.-Conn. — 7500 Grace Drive, Columbia, Howard County, MD — plastics pyrolysis pilot — OGW: listed (“W.R. Grace Chemical Recycling Plant”, rec_cqqi9egh93jvge30dpt0)

CSRC Group / Sheico Group / Eco Infinic — former Continental Carbon site, Phenix City, Russell County, AL — tire pyrolysis — NOT IN OGW — share with EIP (reported, not confirmed)

  • Announced June 3, 2024: 30,000 t rCB, 35,000 t tire pyrolysis oil, 2,300 t steel wire per year; “production expected to start 2026.” No 2026 update located; no ADEM permit located. Stale but unwatched and large. Source (paywalled after two paragraphs): https://www.tyreandrubberrecycling.com/articles/news/large-scale-pyrolysis-plant-for-alabama/
  • Next step: ADEM eFile search, Russell County, “Eco Infinic” / “CSRC” / “Continental Carbon” for an air permit or modification since 2024. ————————

3. CHANGES ON KNOWN FACILITIES

Waste Energy Corp (OTCID: WAST) — Midland Waste Conversion Campus, Midland County, TX — SITE TRIPLED, COMMISSIONING — NOT IN OGW — share with EIP

Brightmark Plastics Ashley OpCo LLC — Ashley, Steuben County, IN — IWP RENEWAL FINALIZED

  • Agency: IDEM Office of Water Quality. Permit INP000663, Industrial Wastewater Pretreatment, Minor Renewal. Public Notice No. 20260805 – INP000663 – F, final permit issued, notice dated August 5, 2026 (listing window 08/05–08/24/2026). Administrative appeal window (15 days, 18 by mail, to OALP) closed ~08-20/23.
  • Verbatim: “The permittee manufactures liquid petroleum products from recycling and deconstruction of end-of-life plastics. The facility discharges 0.03 MGD of sanitary wastewater and non-process wastewater to the Town of Ashley WWTP.”
  • Permit manager: Jodi Wray, 317-234-9739, jwray@idem.in.gov. New expiration date not in the notice — pull permit via IDEM VFC (search INP000663); IWP terms are typically 5 years (~2031).
  • OGW: listed (facility/1013); this renewal not recorded.
  • Source: https://www.in.gov/idem/files/notice_20260904_npdes_inp000663.pdf
  • Next step: records request for the 2025-2026 DMRs (four daily-max exceedances in the prior file: total cyanide x3, chloride x1) and the final permit’s new expiration date for the renewal calendar. No Brightmark air action in Steuben County this window.

Green Mountain Energy LLC — West Paducah, McCracken County, KY — WATER PERMIT APPLICATION WITHDRAWN

  • Change: May 29, 2026 — withdrew its Army Corps of Engineers water pollution permit application for the Ohio River plastics-to-fuel plant (Beyond Plastics release 2026-06-09, citing OGW). Not previously in the log; log said “confirm current permit status.”
  • Air permit F-25-019 (Conditional Major/Synthetic Minor; Source ID 21-145-00157, AI 184811): KY DAQ “EXECUTIVE SUMMARY FINAL” dated October 7, 2025 indicates the air permit was issued — reported, not confirmed (document at https://us-east-1.storage.xata.sh/m70jvtus2agj44154spcvud941nfatlk could not be re-read this run). KY DAQ notice page not readable.
  • OGW: listed (rec_d2tg2v97uo67v8p3c58g), withdrawal recorded by OGW.
  • Sources: https://www.beyondplastics.org/press-releases/chemical-recycling-companies-pull-back · https://gmellc.net/
  • Next step: KY DAQ — confirm F-25-019 issuance date and expiration (Conditional Major permits carry a 5-year term → renewal ~Oct 2030); a Corps withdrawal with an air permit in hand means the project is stalled, not dead.

Freepoint Eco-Systems Eloy Recycling LLC — Eloy, Pinal County, AZ — permit C31386.R01 — STATUS UNRESOLVED

  • Pinal County AQCD pages returned empty bodies and browser navigation was denied. Whether the final revised Class II permit (LPG loadout, “Equipment Update”) was issued after the 03-09 hearing could not be determined. The only readable document remains labeled DRAFT (header dated 1/14/26).
  • Hebron OH shutdown (07-26) is on the record as new evidence. Freepoint told the Pinal BOS in Feb 2026: “We are only going to build this one if the first one works” (Inside Climate News, 2026-04-20).
  • Next step: AZ partners call Pinal AQCD (airquality@pinal.gov, 85 N Florence St, Florence AZ 85132) for the C31386.R01 final action date; if issued, appeal clock is 30 days from issuance under Pinal Code.

Alterra Energy LLC — Akron, Summit County, OH — renewal PTIO P0133062 — FINAL STATUS UNRESOLVED

  • Ohio EPA notice system (JS) unreadable; no document confirming final issuance of the 2025 draft renewal (5,000 lb/hr Plastics Recycling Unit 1) was found. Stack test was due 2026-05-22 under the draft.
  • Next step: Ohio EPA eBusiness/eDocs query on P0133062 and a records request to Akron Regional AQMD (Laura Miracle, lmiracle@schd.org, 330-375-2480) for the stack-test report and the Subpart AAAA quarterly yield reports.

Priority Plastics, Inc. — Portland, Jay County, IN — window closed, no final action posted

  • Draft MSOP M075-50299-00039 comment period closed on or about 2026-08-25. As of the 09-01 IDEM page update, the notice is off the list and no Notice of Decision appears. Conversion process never confirmed. Update log status to WINDOW CLOSED — watch for final action; check IDEM CAATS permit 50299.

Renewal calendar — permits expiring within 12 months

  • The “Permit Expiration (renewal calendar)” column is empty for every logged facility except Brightmark Ashley (2026-07-31, now renewed). Nothing can be flagged for expiry within 12 months because the dates were never captured. Populate next run: Alterra Akron PTIO (renewal issued 2025 — check term), Green Mountain F-25-019 (if issued 2025-10-07, expires ~2030-10), Freepoint Eloy C31386 (Class II, issued 2021 — check term), Waste Energy Midland Ch. 328 (2031-07), Nexus McDonough 2869-151-0065-S-01-0. ————————

4. JURISDICTIONS ENUMERATED THIS RUN

  • INDIANA (IDEM) — COMPLETE. All-regions page plus Northwest, Southeast, Southwest, Western regional pages read in full; every notice with a start date ≥ 08-01 enumerated (roughly 150 air/water/land items). Screened out by PDF: Reclaimed Energy Division/Superior Industrial Solutions, Connersville (solvent recovery, comments due 09-23); EM Materials, Wheatfield (Part 70 admin renewal, 10-02); Liberty High BTU, Monticello (biogas flare, 09-18). Only in-scope hit: Brightmark INP000663 final. No SIC 2999, rBHET, glycolysis, or Subpart AAAA language anywhere.
  • GEORGIA (EPD) — COMPLETE. Advisories PA0826-1, -2, -3, -4 and PA0926-1 (Aug 5 – Sep 2) read in full plus Air Protection Branch announcements. No plastics/tire conversion item. Brightmark Thomaston (App 29749) does not appear in any advisory; no final Title V located — but permitsearch.gaepd.org was unreadable, so a quiet issuance would be invisible. Do not conflate with Interfor Thomaston Mill (Upson Co. lumber, permit 2421-293-0007-V-04-1). Comments address for GA: Air-Permits.Comments@dnr.ga.gov; 4244 International Pkwy Ste 120, Atlanta 30354.
  • NORTH CAROLINA (DEQ) — PARTIAL. deq.nc.gov/public-notices-hearings pages 1–4 read; item count shifted mid-read (37 → 38 → 45), so some notices were never displayed. Nothing in-scope among ~30 items seen; no Cumberland County or Braven notice. Waste Energy Corp Fayetteville: confirmed scrapped March 2025 (Fayetteville Observer 2025-03-05 via EHN); company “will still consider using the site for plastic collection.” Braven Zebulon: closed (Beyond Plastics).
  • TEXAS (TCEQ) — NOT CLEAR. Pending-NSR list read in full but “Data Updated: 9/16/2025”; Title V pending list read A–I only, “Data Updated: 6/8/2026.” Pending data moved to the new TCEQ Permit Search Portal on 2026-08-31 — unreadable to our tools. No Aug 2026 TX notice was enumerated from any source. Known pending: Eastman Chemical Plastics Processing Plant, 300 Kodak Blvd, Longview, Harrison County, NSR permit 177385 (methanolysis, VOC 52.72 tpy, NOx 12.09 tpy) — application dates to 2024, project on hold; no new action found. Source: https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/177385-pls-english.pdf
  • OHIO (Ohio EPA) — NOT READ. epa.ohio.gov/public-notices and notices.epa.ohio.gov (JS app) unreadable; browser denied. Weekly Review for Aug 2026 not enumerated. Freepoint Hebron: no Director’s Final Findings and Orders located as a document; enforcement case and Apr 28 recycling-status revocation are secondary-source only. Dec 18, 2025 NOV read: https://edocpub.epa.ohio.gov/publicportal/ViewDocument.aspx?docid=3947921
  • KENTUCKY (DAQ) — NOT READ. Air public-notices page unreadable; only the EEC link hub loaded.
  • WEST VIRGINIA (WVDEP) — AGENCY PAGE NOT READ; item resolved via press and statute. dep.wv.gov denied; apps.dep.wv.gov PDFs returned empty bodies. Gazette-Mail legal notice for R13-3728 has expired from the classifieds site.
  • ARIZONA (Pinal County AQCD) — NOT READ. All pinal.gov pages empty or denied.
  • PENNSYLVANIA (PA Bulletin) — NOT READ. pacodeandbulletin.gov denied/empty. Issues 56-31 through 56-36 (Aug 1 – Sep 5) unexamined.
  • NEW YORK (NYSDEC ENB) — NOT READ. dec.ny.gov listing pages empty/denied; individual notice pages render when the exact URL is known. Region 8/Monroe County unchecked. Reju: no DEC filing, SEQR notice, or FID found by search through 09-03; Technip Energies board decision still pending. Naming trap: “Town of Monroe” ENB items are Orange County/Region 3, not Monroe County.
  • MARYLAND (MDE) — READ (Grace pages only). W.R. Grace Curtis Bay Works, 5500 Chemical Rd, Baltimore: draft Air Quality Permit to Construct, hearing held 2026-07-06, comment period extended through September 11, 2026 (8 days), comments to shannon.heafey@maryland.gov. Scoped out on feedstock — Industrial Catalyst Operation and MAGNAPORE polymerization-catalyst line, not plastic or tire feedstock. Logged so the same-operator hit is not re-reported. https://mde.maryland.gov/programs/permits/AirManagementPermits/Pages/WR-Grace-Permit-Meeting.aspx
  • NEVADA (NDEP) — READ via news. MediWaste Pahrump SWMF permit finalized effective 2026-08-26 (medical waste; out of scope). https://pvtimes.com/news/ndep-issues-mediwaste-permit-190045/
  • OKLAHOMA (ODEQ), CALIFORNIA (CalRecycle / BAAQMD) — NOT ATTEMPTED this run (capacity). Freepoint Yermo notice dates remain unconfirmed.
  • Oil & Gas Watch — NOT READ. oilandgaswatch.org denied in browser, JS shell via fetch, 403 from shell. Partial inventory (~31 of ~59 facilities) reconstructed from search index and news.oilandgaswatch.org. OGW’s own count (2026-07-16): “10 chemical recycling plants have been built or expanded since 2012, while another 49 are currently proposed, permitted, or under construction.” No OGW news item in the window reported a new draft permit. The 2025-08-14 OGW fact sheet PDF and the OGW Drive download folder were both blocked; if Marty pastes either URL into a message, they become fetchable.
  • Tracers. “Subpart AAAA” / “40 CFR 60.1465” / “60.1020(h)” / “plastics or rubber recycling unit” / “Products of Petroleum and Coal, N.E.C.” returned no new 2026 permit. “1,4-dioxane” + glycolysis: no facility hit. Tire pyrolysis permit 2026: no US hit beyond Waste Energy and InnoVent.
  • Newswires / filings. No new US site announcement Aug 1 – Sep 3 for Brightmark, Alterra (Nerea licensing only), Encina, New Hope (mothballed; CEO signals a larger Gulf Coast site), Cyclyx (Houston structural work complete; CCC2 DFW to be Agilyx-owned), Nexus, PureCycle (Q2 08-07; Augusta Gen 2 engineering), Eastman (Rubbermaid offtake only), LyondellBasell (MoReTec-2 Houston FID not announced; Cyclyx stake written down), Resynergi (relocation state still undisclosed), Reju, Loop, Klean (Boardman OR — no milestone). CLNV and WAST have both filed Form 15; no 8-K trail exists for either.
  • Community signals. Change.org and Care2 could not be searched by creation date (browser denied). Action Network POPCO petition found, undated.
  • Federal. EPA proposal (docket EPA-HQ-OAR-2025-0068) to pull pyrolysis units out of the incinerator definitions — next action expected late 2026/H1 2027. Environmental Protection Network 08-20 release on an EPA proposal to curtail public notice for certain air permits: https://www.environmentalprotectionnetwork.org/20260820_nrs-comment_release/ — directly relevant to whether future pyrolysis permits get noticed at all. ————————

5. CHANNEL STATUS CHANGES

New PROVISIONAL channels (review date 2026-12-03):

  • Maryland MDE Air and Radiation Administration — permit pages and draft permits render as static HTML/PDF; one in-scope operator (Grace Columbia pyrolysis) plus an adjacent draft. Promote if a second in-scope notice appears.
  • TCEQ 30 TAC Ch. 328 scrap tire registrations / TCEQ Permit Search Portal (new portal live 2026-08-31) — tire-pyrolysis operators enter through Ch. 328 before any air notice. Needs a browser-capable reader.
  • Alabama ADEM eFile — one sighting (CSRC/Sheico Phenix City), stale. One sighting is a notice, not a channel; review 12-03.
  • Tyre & Rubber Recycling (trade press) — caught InnoVent, Waste Energy commissioning, and the Alabama project; add to the newswire rotation. Review dates due this run: none. The 08-06 sweep added Georgia EPD, Kentucky DAQ, NDEP, and state water/pretreatment channels without review dates; set them to 2026-11-06. Promotions/retirements: none. Recommend Georgia EPD be promoted to CONFIRMED at its review date — second in-scope sighting (Brightmark Thomaston) plus a readable weekly advisory format; it is the best-behaved agency page in the file. ————————

6. MOVEMENT ON KNOWN FIGHTS (context only)

  • Freepoint Hebron, OH: shut down 07-26; Ohio EPA told the company 04-28 it “no longer qualifies as a recycling unit” — secondary sources only; no orders document located.
  • Braven Environmental: Texarkana TX $145M plant cancelled (Beyond Plastics dates it 05-24; OGW 05-28); Zebulon NC plant observed non-operational 06-25 with hazardous-waste issues in state records.
  • Beyond Plastics count (06-09): eight commercial “chemical recycling” facilities operating nationally, six of them pyrolysis.
  • Waste Energy Corp Fayetteville, NC: confirmed scrapped March 2025; site still a possible plastics collection point.
  • Reju Rochester: FID still pending at Technip Energies; no DEC filing. ———————— Yield: 8 leads · 3 net-new facilities (InnoVent TX, Grace Columbia MD, CSRC Phenix City AL) · 5 changes on known facilities (Clean-Seas final permit/appeal clock, Waste Energy Midland expansion, Brightmark Ashley IWP final, Green Mountain Corps withdrawal, Priority Plastics window closed) · 2 jurisdictions fully enumerated (IN, GA), 1 partial (NC), 9 not readable (OH, KY, WV, AZ, PA, NY, TX live portal, OGW, OK/CA not attempted). ————————

PROCESS NOTE

  1. Both canonical docs are missing from every location the task names. No file titled CANONICAL_Facility-Detection-Lexicon or CANONICAL_State-Permit-Channel-Map exists in Drive, the working folder, uploads, or the project files. Either they live under another name or were never saved to Drive. This run rebuilt the channel list from the 08-06 sweep. Fix before next Thursday or every run will re-derive the map.
  2. Coverage log has a duplicate. Two Google Sheets named CR-Brief-Coverage-Log (IDs 13i_tWQqery… and 1TiFCdXNHlGDtylcbsDHOe3m91NY1VaLqcJlSpfpmkKc). Delete or rename the second.
  3. The Drive connector cannot append rows to a Google Sheet. New rows and status updates are in the companion CSV (CR-Brief-Coverage-Log_APPEND_2026-09-03.csv) in the outputs folder and uploaded to Drive as a Google Sheet (https://docs.google.com/spreadsheets/d/1oI1v9yu8U222q_k4YhECm98Ot9ztciBOevtzczXCdkE); paste into the master sheet. The renewal-calendar column is empty for every facility — populate it or the 12-month expiry check is a no-op.
  4. Agency pages are the failure mode. Browser navigation was denied for every .gov domain tried (dep.wv.gov, epa.ohio.gov, eec.ky.gov, in.gov, pinal.gov, tceq.texas.gov, pacodeandbulletin.gov, dec.ny.gov, permitsearch.gaepd.org) and for oilandgaswatch.org and change.org. Only static HTML/PDF agencies (IDEM, GA EPD, NC DEQ, MDE, TCEQ asset files) were readable. Nine jurisdictions are unread, not clear. Channel Map should record for each channel: static (fetchable) vs JS (needs browser) vs denied — and the Thursday sweep should be run from a session where the browser pane has these domains allowed.
  5. OGW fact sheet and download folder are one paste away: if Marty puts https://cdn.prod.website-files.com/62963b843bd3a03f930371e2/689df76b482328dacf95ce0b_OGW_ChemicalRecycling_FactSheet_8.14.25.pdf and the OGW Drive downloads folder link into a message, the next run can fetch them and close the ~28-facility gap in our OGW mirror.
  6. Lexicon additions from this run: Form 15 / suspended SEC reporting as an operator signal (CLNV, WAST — the two most active small-cap pyrolysis builders have gone dark); “waste conversion campus,” “waste conversion system,” “tire-derived oil,” “recovered carbon” (Waste Energy vocabulary); “ELT shredding and recycling facility” as pyrolysis feedstock prep (InnoVent); 30 TAC Ch. 328 registration as the Texas tire-pyrolysis entry permit; WV §22B-1-7(c) 30-day service-based appeal clock (not §22B-3-4, which is repealed).
  7. TCEQ pending-permit HTML lists are stale (9/2025 and 6/2026) and the live data moved to a JS portal on 08-31. Texas has effectively lost its enumerable channel; needs a browser-capable pass or a partner inside Texas pulling the portal weekly.