Facilities / Nexus Circular McDonough pyrolysis facility

Nexus Circular McDonough pyrolysis facility

Verified Facility identity checked by an admin.

Facility info

FieldValueSource
EPA registered nameNEXUS CIRCULAREPA ECHO
Address201 King Mill Ct, McDonough, Henry County, GA 30253EPA ECHO
Coordinates33.39835, -84.14892EPA ECHO
OperatorNexus CircularVerified
EPA programsClean Air Act (CAA) Clean Water Act / NPDES (CWA)EPA ECHO
NAICS236210, 325110EPA ECHO
SIC1541, 2869EPA ECHO
Active in ECHOYesEPA ECHO
EPA region4EPA ECHO
EPA registry ID110071435189EPA ECHO
Facility typepyrolysisInferred from a news reportReasoning: The C&EN feature on whether plastic pyrolysis is worth saving covers Nexus as a pyrolysis operator building McDonough lines with its improved technology.C&EN: With recycling plants closing, is plastic pyrolysis worth saving? (2026-09-30) ↗Recorded in report 2026-10-05-watchlist
StageConstructionInferred from a news reportReasoning: C&EN reports Nexus is installing 12 production lines at McDonough, with the first two to start up by year-end, so construction is under way and processing has not begun.C&EN: With recycling plants closing, is plastic pyrolysis worth saving? (2026-09-30) ↗Recorded in report 2026-10-05-watchlist
First report mention2026-09-03A scheduled AI sweep first mentioned this facility in this report.Recorded in report 2026-09-03-sweep
EPA ECHO Location registered with EPA. Open in OpenStreetMap ↗

EPA values come from the EPA snapshot 20261101_090957 and are shown in place of anything an AI sweep reported for the same field. AI-found values were found in public sources by scheduled AI sweeps; the token opens where the value was found: the passage quoted from the source or the reasoning behind the value, the source, and the report that recorded it. Quotes are copied by the AI and not yet checked against their sources. Verified values were set or checked by an admin.

Published data

EPA data as of: ECHO Exporter as of 2026-11-01 · RCRA compliance (RCRAInfo) as of 2026-11-01 · Toxics Release Inventory reporting years 2020–2024 · RCRA Biennial Report cycles 2021, 2023 · e-Manifest as of 2026-10-25

Identity & operationsEPA ECHO, TRI, RCRA Biennial Report · as of 2026-11-01

EPA tracks this facility under one EPA record, registered in Clean Air Act and Clean Water Act (NPDES).

Parent company (TRI)
Not reported to TRI
RCRA generator status
Not in the Biennial Report
EPA facility records
1 registry ID

Details

110071435189 · NEXUS CIRCULARCAA, CWA

201 King Mill Ct, McDonough, GA 30253

Operational status
Active
County
Henry County
EPA region
Region 4
NAICS industry code
236210, 325110
SIC industry code
1541, 2869
Overall compliance status
No Violation Identified
Receiving water
Not flagged as impaired
Penalties assessed
$0
EPA programs this record is registered in
ProgramProgram IDsPermit / classificationCompliance statusQuarters in non-complianceActions, formal / informal
Clean Air ActGA0000001315100065 ↗Synthetic Minor EmissionsNo Violation Identified0 quarters—
Clean Water Act (NPDES)GAR18A64E ↗Non-MNo Violation Identified0 quarters—

Releases & emissionsEPA Toxics Release Inventory (Form R)

Does not report to TRI.

    Off-site transfersEPA Toxics Release Inventory (Form R)

    No TRI off-site transfers reported.

      Hazardous wasteEPA RCRA Biennial Report, e-Manifest

      No RCRA Biennial Report or e-Manifest activity.

        Compliance & enforcementEPA ECHO, RCRAInfo · status as of 2026-11-01

        ECHO lists no current violations at the snapshot.

        Compliance quarter by quarter Each box is one quarter, oldest on the left, ending at the snapshot (2026-11-01): _ no violation identified V violation S significant violation
        110071435189CAA____________
        110071435189CWA_____________

        Details

        Compliance summary for each EPA record1 row
        Registry IDCompliance statusSignificant non-complierFormal actionsInformal actionsPenaltiesInspectionsLast inspection
        110071435189No Violation IdentifiedNo0 actions0 actions$00 inspections—
        • No RCRA inspections, violations, or enforcement actions on record.

        Source datasnapshot 2026-11-01

        Snapshot 20261101_090957, refreshed 2026-11-01. Each dataset is as current as EPA's own file:

        Figures can differ from EPA's live portals where EPA has updated its data since then. Each EPA record's Detailed Facility Report is linked under Identity & operations.

        Rolling updates

        Scheduled AI sweeps of public sources find the stage, deadlines, and sources below, and an AI writes the summary from them. They may not be comprehensive. Check the linked sources before relying on any of it. About the data

        Summary from the latest report mention, AI-written

        Stage Construction Inferred from a news reportReasoning: C&EN reports Nexus is installing 12 production lines at McDonough, with the first two to start up by year-end, so construction is under way and processing has not begun.C&EN: With recycling plants closing, is plastic pyrolysis worth saving? (2026-09-30) ↗Recorded in report 2026-10-05-watchlist

        • C&EN (2026-09-30), quoting Nexus CCO Clint Thompson [company statement in news]: Nexus is installing 12 production lines at McDonough that will add 192,000 t/yr of capacity; the first two lines start up by year-end 2026 and four more in 2027. Not confirmed by any agency record.
        • Offtake contracts with LyondellBasell, Chevron Phillips, and Braskem cover the first six McDonough lines; Cox Enterprises is majority owner. Nexus claims 2.7-3.1 million t of usable waste plastic within 240 km.
        • Permit status unchanged: GA EPD permit 2869-151-0065-S-01-0 (term not captured). A 12-line build-out of this size may need a permit modification. Check GA EPD for a Nexus McDonough application before the year-end startup.

        From report 2026-10-05-watchlist

        Open deadlines

        None found.

        Sources (1) AI-found

        Date foundKindTitleNoteReport
        2026-10-05newsC&EN: With recycling plants closing, is plastic pyrolysis worth saving? (2026-09-30)Feature by Alexander Tullo. McDonough capacity and startup timing are company statements quoted by C&EN.2026-10-05-watchlist