Facilities / Crawford Renewables tire pyrolysis units

Crawford Renewables tire pyrolysis units

AI-found Facility identity not yet checked by an admin.

Facility info

FieldValueSource
LocationAtlantic, Crawford County, PAFound in an agency record“20-00326A: Crawford Renewables, Inc., 5414 Powder Road, Atlantic, PA 16111, Greenwood Township, Crawford County. Application received: August 13, 2026.”The AI copied this quote. It hasn't been checked against the source.PA Bulletin 56 Pa.B. No. 40: Plan Approval application 20-00326A, Crawford Renewables, Inc. ↗Recorded in report 2026-10-04-sweep
OperatorCrawford Renewables, Inc.Found in an agency record“The Department has received a Plan Approval application from Crawford Renewables, Inc. for the installation of two Pyrolysis machines with associated control devices located in Crawford, PA.”The AI copied this quote. It hasn't been checked against the source.PA Bulletin 56 Pa.B. No. 40: Plan Approval application 20-00326A, Crawford Renewables, Inc. ↗Recorded in report 2026-10-04-sweep
Facility typepyrolysisFound in an agency record“The Department has received a Plan Approval application from Crawford Renewables, Inc. for the installation of two Pyrolysis machines with associated control devices located in Crawford, PA.”The AI copied this quote. It hasn't been checked against the source.PA Bulletin 56 Pa.B. No. 40: Plan Approval application 20-00326A, Crawford Renewables, Inc. ↗Recorded in report 2026-10-04-sweep
StagePermittingInferred from an agency recordReasoning: The PA Bulletin lists Plan Approval application 20-00326A among applications in review with no decision on disposition, so a state air permit application is pending.PA Bulletin 56 Pa.B. No. 40: Plan Approval application 20-00326A, Crawford Renewables, Inc. ↗Recorded in report 2026-10-04-sweep
First report mention2026-10-04A scheduled AI sweep first mentioned this facility in this report.Recorded in report 2026-10-04-sweep

EPA values come from the EPA snapshot 20261101_090957 and are shown in place of anything an AI sweep reported for the same field. AI-found values were found in public sources by scheduled AI sweeps; the token opens where the value was found: the passage quoted from the source or the reasoning behind the value, the source, and the report that recorded it. Quotes are copied by the AI and not yet checked against their sources.

Published data

No EPA records are linked to this facility yet: the facility registry has no EPA registry id for it.

Rolling updates

Scheduled AI sweeps of public sources find the stage, deadlines, and sources below, and an AI writes the summary from them. They may not be comprehensive. Check the linked sources before relying on any of it. About the data

Summary from the latest report mention, AI-written

Stage Permitting Inferred from an agency recordReasoning: The PA Bulletin lists Plan Approval application 20-00326A among applications in review with no decision on disposition, so a state air permit application is pending.PA Bulletin 56 Pa.B. No. 40: Plan Approval application 20-00326A, Crawford Renewables, Inc. ↗Recorded in report 2026-10-04-sweep

  • PA DEP Northwest Region Air Quality Program, Plan Approval application 20-00326A, received 2026-08-13: 'installation of two Pyrolysis machines with associated control devices' to 'break down tire sidewalls and tread to produce reusable products.' Site 5414 Powder Road, Atlantic PA 16111, Greenwood Township.
  • Published in the PA Bulletin 2026-10-03 (Vol. 56 No. 40) as an application of 'Special Public Interest' still in review; no draft plan approval yet. No capacity or product slate stated.
  • 30-day comment and hearing-request period from publication, deadline about 2026-11-02 (our calculation; confirm with DEP). Comments to DEP NW Region, 230 Chestnut St, Meadville PA 16335; David G. Balog, P.E., 814-332-6328.
  • Not in Oil & Gas Watch; no news coverage found. Crawford Advanced Materials (biomass pyrolysis) in the same township is a separate company; any link unconfirmed.
  • Tier 3 surfaced it first: Greenwood Township Planning Committee agenda of 2026-05-21 listed 'Crawford Renewables - Air Quality Plan Application - Comments for DEP?', about five months before the PA Bulletin notice. June 1, 2026 supervisors' minutes (scanned PDF; text reported by a research pass, not independently read) say the planning committee 'will be sending comments to DEP about the plan.'
  • Same principal (Greg Rubino) heads Crawford Renewable Energy, LLC (the 2016-abandoned 20-305A tire-derived-fuel power plant, which was followed by announced tire pyrolysis plans) and Crawford Advanced Materials (wood biomass pyrolysis). Reported, not confirmed. Next township planning meeting 2026-10-15, 6:00 p.m.
  • No PA Bulletin issue after Vol. 56 No. 40 posted as of 2026-10-08; DEP deadline language still not independently confirmed.
  • Greenwood Township Planning Committee agenda for 2026-10-15 lists only 'Comprehensive Plan' (old business) and 'Kerchin non-building waiver request' (new business); no Crawford Renewables item. Next committee meeting 2026-11-19, after the 2026-11-02 DEP deadline.
  • PA Bulletin Vol. 56 No. 42 (2026-10-17) read in full: no Northwest Region air items and no Crawford or 20-00326A entry, so nothing confirms or changes the 2026-11-02 date.
  • PA Bulletin Vol. 56 No. 43 (2026-10-24) read: no Special Public Interest section, no Crawford or 20-00326A entry. The 2026-11-02 deadline is still our calculation and unconfirmed with DEP.
  • Greenwood Township Planning Commission minutes of 2026-09-17 and supervisors' minutes of 2026-08-03 read in full: no Crawford Renewables item. The May 2026 planning minutes (the meeting that took up the air plan application) were approved 09-17 but are not posted.
  • PA Bulletin Vol. 56 No. 44 (2026-10-31), DEP notice 1599/1599a/1599b, read: no Crawford Renewables, 20-00326A, Greenwood or pyrolysis entry, so no correction, extension, hearing or draft. Its Special Public Interest list has only CDE Acquisitions 39-00117A and Cronimet Greenville 43-00385E. The calculated 2026-11-02 deadline (1 day as of 11-01) still stands unconfirmed by DEP.

From report 2026-11-01-sweep

Open deadlines

No open deadlines found.

Past and superseded deadlines (1)

Sources (7) AI-found

Date foundKindTitleNoteReport
2026-11-01agencyPA Bulletin Vol. 56 No. 44 (2026-10-31), DEP Applications, Actions and Special Notices1599, 1599a, 1599b read by a research pass; no Crawford item. Special Public Interest: 39-00117A CDE Acquisitions (Lehigh Co.), 43-00385E Cronimet Greenville (Mercer Co., tungsten scrap calciner).2026-11-01-sweep
2026-10-29agencyGreenwood Township Planning Commission minutes, 2026-09-17No Crawford item. Supervisors' 2026-08-03 minutes (https://greenwoodtwpcrawfordpa.gov/wp-content/uploads/2026/09/08-2026-Meeting-Minutes1.pdf) also read; no Crawford item.2026-10-29-sweep
2026-10-29agencyPA Bulletin Vol. 56 No. 43 (2026-10-24), DEP noticesNo Crawford item; NW Region air items listed are unrelated. Part of 1555a truncated in the read.2026-10-29-sweep
2026-10-18agencyGreenwood Township (Crawford Co., PA) Planning Committee agenda, 2026-10-15No Crawford Renewables item. Next meeting 2026-11-19 6:00 pm. Minutes of the 10-15 meeting not yet posted.2026-10-18-sweep
2026-10-08agencyGreenwood Township (Crawford Co.) June 2026 supervisors' meeting minutesScanned PDF (posted 2026-09). Planning committee reviewed the Air Quality Plan Application for Crawford Renewable and will send comments to DEP. Quote via research pass; scan not machine-readable to this run. The 2026-05-21 planning committee agenda item was confirmed via search index.2026-10-08-sweep
2026-10-08agencyGreenwood Township, Crawford County, PA (agendas and minutes)Next planning committee meeting 2026-10-15 6:00 p.m.; supervisors' budget meeting 10-12. September supervisors' minutes not posted.2026-10-08-sweep
2026-10-04agencyPA Bulletin 56 Pa.B. No. 40: Plan Approval application 20-00326A, Crawford Renewables, Inc.Application received 2026-08-13; two tire pyrolysis machines; Special Public Interest list.2026-10-04-sweep