Reports / 2026-11-15 · sweep

Early-Warning Sweep — 2026-11-15

AI-written

This report was written by a scheduled AI sweep of public sources. It may contain errors; check the sources it links before relying on it.

Window: 2026-11-12 to 2026-11-15. The canonical docs (lexicon, channel map plus run additions) and the coverage log (105 rows) were readable. Every item below was dedupe-checked against the log.

Lead item: a quiet window. No net-new facility and no new permit action on a tracked facility surfaced. Three windows from earlier runs are still open: ADEM scrap tire rule hearing, 2026-11-19 (4 days, URGENT); Empire Green Generation, Follansbee WV, draft R13-3555B, comments by 2026-11-30 (15 days); and the Alterra Energy Akron P0133062 ERAC appeal, earliest reading 2026-12-10 (25 days). Oil & Gas Watch still shows Alterra’s P0133062 as “Draft Issued” on 11-15, so EIP has not recorded the 11-10 final.


1. DEADLINE INSIDE 30 DAYS

URGENT, 4 days (adjacent rulemaking): ADEM Scrap Tire Program rule, Div. 335-4 (Public Notice 423), Alabama

  • Status: carried forward, no change.
  • Hearing: 2026-11-19, 10:00 am, ADEM Main Hearing Room, 1400 Coliseum Blvd, Montgomery.
  • Comments: written comments by 5:00 pm 11-19 to hearing.officer@adem.alabama.gov.
  • Relevance: “Processed Tire Material” is defined to include any “thermal process”, and the rule names no pyrolysis. Two tracked Alabama tire pyrolysis sites: Eco Infinic Phenix City and Alabama Renewable Energy Montgomery.
  • Source: https://adem.alabama.gov/sites/default/files/2026-09/09-26div4-rules.pdf
  • Next step: any Alabama partner comment must be filed by 5 pm Thursday 11-19. Draft it Monday.

15 days: Empire Green Generation LLC, 801 Koppers Road, Follansbee, Brooke County, WV

  • Agency: WVDEP Division of Air Quality, NSR.
  • Permit: draft R13-3555B, Facility ID 009-00141, permit writer Edward Andrews.
  • Stage: preliminary determination to issue (facility stage unchanged).
  • Dates: received 03/27/2026; DAQ public notice date 10/30/2026; “Last Day to Comment” 11/30/26. The NSR sheet was re-read on 2026-11-15 and the row is unchanged.
  • Deadline: “before 5:00 p.m. on Monday, November 30, 2026”. 15 days remaining, counting from 11-15. The up-to-90-day WV statutory review runs separately.
  • Hearing: none listed. A public meeting can still be requested.
  • Comments to: daqpubliccomments@wv.gov, subject “Empire Comments”; Edward Andrews P.E., 601 57th St SE, Charleston WV 25304, (304) 926-0499 ext. 41244.
  • OGW: listed On Hold; this action not recorded. Share with EIP.
  • How surfaced: WVDEP NSR sheet (11-01 run).
  • Sources:
  • Next step: the Thanksgiving week eats into the window, so partners should draft this week. Ask DAQ (Andrews) for the EPA section 129 response letter (indexed, but 404 since 11-08). Request a public meeting in the same email.

25 days (earliest reading): APPEAL WINDOW, Alterra Energy, LLC, 1200 East Waterloo Road, Akron, Summit County, OH

  • Agency: Ohio EPA, Division of Air Pollution Control; Akron Regional Air Quality Management District is the local agency.
  • Permit: renewal PTIO P0133062, Facility ID 1677011258, Plastics Recycling Unit 1 (5,000 lb/hr plastics feed). The notice is “Final Issuance of Permit-To-Install and Operate”, action date 2026-11-10, notice 225909.
  • New this run:
    • Not on the 11-16 Weekly Review. The weekend search (Weekly Review 11/15 to 11/23, Program “Air Pollution Programs”, State “”) returned the full air list with no Alterra row. The final has had no Weekly Review date since 11-10.
    • If Weekly Review publication is what gives “notice of the Director’s action” to non-parties, their clock has not started. Do not rely on that: plan on 2026-12-10, counted from the action date.
    • The notice-detail page for 225909 did not render after 20 s in the browser on 11-15, so its Weekly Review field could not be re-read directly. Another notice (225970) rendered normally.
    • Oil & Gas Watch (facility 5859), read in the browser on 11-15: still lists “P0133062 Clean Air Act - Air Construction Draft Issued”. Listed, but this action is not recorded. Share with EIP.
  • Where appeals go: the Environmental Review Appeals Commission, Columbus (confirm the filing address on the ERAC site). Notice of the filing goes to the Director within 3 days. Local contact: Laura Miracle, Akron Regional AQMD, 1867 West Market St., Akron OH 44313, (330) 375-2480.
  • Sources:
  • Next step:
    • Pull the final permit and the response-to-comments document in eDocument Search (P0133062).
    • Ask the Ohio EPA Hearing Clerk (HClerk@epa.ohio.gov, 614-644-3037) when 225909 will run on the Weekly Review, and get counsel’s view on which date starts the ERAC clock.

2. NET-NEW FACILITIES

None this window. These searches turned up nothing new:

  • Searches: pyrolysis / tire pyrolysis / plastics-to-fuel hearings and zoning; “advanced recycling” and “chemical recycling” site announcements; “plastics or rubber recycling unit”; Freepoint, Nexus, Eco Infinic, Grace, Clean-Seas, Syre and Brightmark Thomaston news.
  • Trade press: Resource Recycling’s November announcements (11-06 to 11-15) and Recycling Today’s plastics page.
  • What came back:
    • non-US items: Clean Planet Energy Sleaford (UK) got planning permission on 11-11; VPR Rotterdam;
    • US items already logged, or older ones: the Braven Zebulon benzene story of 2026-07-14, and Brightmark Thomaston’s May hearing.
  • Brightmark Thomaston: no EPD decision found.

3. CHANGES ON KNOWN FACILITIES

Alterra Energy, Akron OH

See Section 1. The final is not on the 11-16 Weekly Review, and OGW still shows it as draft. The stage stays operating. No facility-file change this run: the OGW page is already a source, and nothing about the facility changed.

Renewal calendar (from the log, expiring within 12 months)

  • Alterra Akron: the new P0133062 expiration date is still not captured.
  • No other logged permit expiration falls before 2027-11.

Standing watches, no change

  • Reju Rochester: no NYSDEC ENB issue since 11-11 (the next is 11-18). No Reju news since 11-09 beyond the Resource Recycling 11-09 item on mill partners (no site, permit or timeline).
  • Waste Energy Fayetteville NC: NC DEQ combined notices, page 1 of 5. No Cumberland or Waste Energy item.
  • Waste Energy Midland TX: no release since 11-03. Investor call 11-17 after market close; commissioning target 12-01.
  • Synthesia Stillwater 2026-0031-C: the ODEQ grid still shows “Comment Review (06/26/2026 - 09/24/2026)”, “Under DEQ Review”. No final.
  • Crawford Renewables 20-00326A: PA Bulletin 56-46 (11-14) has no Crawford, 20-00326A, Greenwood or pyrolysis item and no Special Public Interest section. Still no draft plan approval.
  • BurCell Martinsburg R13-3795: WV sheet unchanged (Proposed Start-Up 1/1/2027, no notice date).
  • Enviro Recycling Kingsbury IN: window closed 11-07. The IDEM list (updated 11/13) still carries the draft entry; no final yet.
  • Conversion Energy (Houston) gasifier auction (11-12): no result or buyer found.

4. JURISDICTIONS ENUMERATED THIS RUN

  • Ohio EPA (CONFIRMED): notices DB in the browser, weekend procedure: Weekly Review 11/15 to 11/23/2026, State “”, all date fields cleared first, Program “Air Pollution Programs”, Show All Rows.
    • About 60 air rows on the 11-16 list, all screened by name and notice type. About 12 of them are Sunoco Pipeline portable-flare relocations.
    • Opened: Will-Power OH, LLC - NEO (P0140740, Licking Co.). It is a draft PTI for gas turbines and engines supplying power to an adjacent customer, so out of scope (hearing 12-17, comments to 12-20).
    • Screened by name, not opened:
      • Plymouth Foam Title V application;
      • POLYSOURCE / Epsilyte application (EPS);
      • Washington Penn Plastics application (compounding; opened 11-12);
      • Digester Energy Cardington (anaerobic digester);
      • DeMilta Iron & Metal (scrap metal).
    • No Alterra row.
  • Indiana IDEM (CONFIRMED): all-regions list, updated 11/13/2026.
    • New air drafts: RadiusDC (Hendricks), Iron Baluster / Viewrail (Elkhart), Amazon Data Services (Lake). None in scope by name.
    • Water and land notices screened by name: none in scope.
  • West Virginia DEP DAQ (NSR sheet): CSV read through r.jina.ai, 83 data rows.
    • New since 11-12: Greer Limestone R13-1303J and Arsenal Midstream G35-E067J / G35-E107H.
    • None in scope. Empire and BurCell rows unchanged.
  • Pennsylvania Bulletin 56-46 (2026-11-14): DEP notices 1683, 1683a and 1683b read.
    • The second part of 1683 (after 100,000 characters) is mining and water items only.
    • No Special Public Interest section. The only Northwest Region air item is the Evergreen Metallurgical (Butler) plan approval extension.
  • Oklahoma ODEQ: read by WebFetch summary, not the browser. 296 records (AQD 180, WQD 108, LPD 8; tallies unverified).
    • No Public Commenting Period starts after 11-03.
    • Keyword rows: Synthesia, Interplastic, Georg Fischer, Armacell, Goodyear WQD. None new in scope.
  • Georgia EPD: a new advisory, PA 1126-2 (dated 2026-11-12), is listed but was NOT READ. WebFetch returned compressed binary, the runner cannot render PDFs (no pdftoppm), and r.jina.ai returned empty. Do not treat Georgia as clear.
  • Arizona Pinal County /401: read through r.jina.ai; the same 9 notices as 11-08 and 11-12. None in scope.
  • Michigan EGLE: NSR “PTIs Open for Comment” Rev. 11/13/2026, read through r.jina.ai. Two items (Hydro Aluminum, Citgo). None in scope.
  • North Carolina DEQ: combined notices, page 1 of 5 only. No Cumberland or Wake item. Pages 2–5 not read.
  • Federal Register: API term “pyrolysis”, published on or after 2026-11-10: 0 documents.
  • Oil & Gas Watch: Alterra facility 5859 only (browser). The full list was not walked.
  • Not read this run (do not read as clear):
    • Texas Register “In Addition”, 11-13 issue: r.jina.ai returned HTTP 405 and a CAPTCHA.
    • Tennessee TDEC air notices: ECONNRESET.
    • Georgia PA 1126-2 (above).
    • Texas TCEQ pending NSR list; Pinal /418; Maricopa “All Apps”; California (CalRecycle, BAAQMD); Maryland MDE; New Jersey; South Carolina; Louisiana; Nevada; Kentucky; NYSDEC (no new issue).

5. CHANNEL STATUS CHANGES

  • No review date came due. The next is the Texas Register “In Addition” (PROVISIONAL) on 2026-12-10.
  • No new provisional channels.
  • The eleven v1.0 outcomes recorded on 2026-11-05 still await the owner.
  • Readability notes added to the run additions:
    • Ohio: the 225909 final is not on the 11-16 Weekly Review, and its detail page did not render.
    • Texas Register: the fifth failed read.
    • Georgia: PA 1126-2 is unreadable in the runner.
    • Tennessee: the fifth failed read.
    • Oil & Gas Watch: facility pages read in the browser.

6. MOVEMENT ON KNOWN FIGHTS

  • Alterra Akron: final P0133062 not yet on a Weekly Review; OGW still shows it as draft; appeal clock 12-10 on the earliest reading.
  • Empire Follansbee: comment window open, 15 days.
  • Waste Energy Midland: investor call 11-17; commissioning target 12-01.

Yield: 1 coverage row: the Oil & Gas Watch status check on Alterra, so the EIP gap is on record. 0 net-new leads, 0 net-new facilities, 0 new permit actions on known facilities (one status change on a known action: Alterra’s final is not on the Weekly Review, and OGW still shows the draft). Jurisdictions enumerated: Ohio, Indiana, West Virginia, Pennsylvania, Oklahoma, Pinal County AZ, Michigan, North Carolina (partial), Federal Register. Georgia, Texas Register and Tennessee were attempted and failed.

PROCESS NOTE

  1. Georgia PA 1126-2 was not read. It is the first Georgia advisory since 11-04, and Georgia is a Brightmark Thomaston jurisdiction with the permit decision pending. Earlier runs read these PDFs from the copy WebFetch saves. This run’s copy was compressed, the Read tool cannot render it without pdftoppm, and the proxy returned empty. The next run should try again first. Installing poppler-utils in the runner image would fix this class of failure, which also hits IDEM and Michigan PDFs.
  2. The ERAC clock question is now live. The Alterra final has an action date (11-10) but no Weekly Review date, five days on. The canonical docs still give no rule for when a non-party’s ERAC 30 days start (repeat of 11-12 note 2). Suggest the owner add one after asking counsel.
  3. Texas Register “In Addition” has not been read since 10-16, and its review date is 2026-12-10. On current evidence that review will have to RETIRE it for unreadability, not for lack of yield, unless a browser route is found.
  4. Tennessee TDEC air notices have failed on every run since the channel was added on 09-29. The Eastman Kingsport debottleneck makes a partner subscription the practical route.
  5. No quote subagents were run. No new facility, stage change or replaced fact source was staged.