Facilities / New Hope Plastics Recycling Plant

New Hope Plastics Recycling Plant

aka Trinity Oaks Tyler Facility

Verified Facility identity checked by an admin.

Facility info

FieldValueSource
EPA registered namesTRINITY OAKS TYLER, LLC TRINITY OAKS FACILITY - TYLER TXEPA ECHO
Address1775 E Duncan St, Tyler, Smith County, TX 75702EPA ECHO
Coordinates32.37208, -95.27980EPA ECHO
OperatorNew Hope EnergyFound in a news report“Rusty Combs, the CEO of New Hope Energy, confirmed that the Tyler facility was “mothballed.””The AI copied this quote. It hasn't been checked against the source.Oil & Gas Watch News: Despite big growth plans, chemical plastics recycling plant in East Texas unexpectedly stops operating ↗Recorded in report 2026-10-22-sweep
EPA programsClean Water Act / NPDES (CWA)EPA ECHO
SIC5093, 1542EPA ECHO
Active in ECHOYesEPA ECHO
EPA region6EPA ECHO
EPA registry IDs110070595972
110070389315
EPA ECHO
Facility typepyrolysisFound in a news report“A chemical recycling plant in Tyler, Texas, shut down this summer after formerly announcing plans for a major expansion next year to make it the largest pyrolysis operation in the world.”The AI copied this quote. It hasn't been checked against the source.Oil & Gas Watch News: Despite big growth plans, chemical plastics recycling plant in East Texas unexpectedly stops operating ↗Recorded in report 2026-10-22-sweep
StageIdleInferred from a news reportReasoning: Oil & Gas Watch reports the Tyler pyrolysis plant, which processed plastic, stopped operating in summer 2024 and its CEO called it mothballed; no permanent closure is reported.Oil & Gas Watch News: Despite big growth plans, chemical plastics recycling plant in East Texas unexpectedly stops operating ↗Recorded in report 2026-10-22-sweep
First report mention2026-10-22A scheduled AI sweep first mentioned this facility in this report.Recorded in report 2026-10-22-sweep
EPA ECHO 2 locations registered with EPA, one per record. Open in OpenStreetMap ↗

EPA values come from the EPA snapshot 20261101_090957 and are shown in place of anything an AI sweep reported for the same field. AI-found values were found in public sources by scheduled AI sweeps; the token opens where the value was found: the passage quoted from the source or the reasoning behind the value, the source, and the report that recorded it. Quotes are copied by the AI and not yet checked against their sources.

Published data

EPA data as of: ECHO Exporter as of 2026-11-01 · RCRA compliance (RCRAInfo) as of 2026-11-01 · Toxics Release Inventory reporting years 2020–2024 · RCRA Biennial Report cycles 2021, 2023 · e-Manifest as of 2026-10-25

Identity & operationsEPA ECHO, TRI, RCRA Biennial Report · as of 2026-11-01

EPA tracks this facility under 2 separate EPA records, registered in Clean Water Act (NPDES).

Parent company (TRI)
Not reported to TRI
RCRA generator status
Not in the Biennial Report
EPA facility records
2 registry IDs

Details

110070595972 · TRINITY OAKS TYLER, LLCCWA

1775 E Duncan St, Tyler, TX 75702

Operational status
Active
County
Smith County
EPA region
Region 6
NAICS industry code
—
SIC industry code
5093
Overall compliance status
No Violation Identified
Receiving water
Not flagged as impaired
Penalties assessed
$0
EPA programs this record is registered in
ProgramProgram IDsPermit / classificationCompliance statusQuarters in non-complianceActions, formal / informal
Clean Water Act (NPDES)TXR05FR45 ↗Non-MNo Violation Identified0 quarters—
110070389315 · TRINITY OAKS FACILITY - TYLER TXCWA

1775 E Duncan Street, Tyler, TX 75702

Operational status
Active
County
Smith
EPA region
Region 6
NAICS industry code
—
SIC industry code
1542, 5093
Overall compliance status
No Violation Identified
Receiving water
Not flagged as impaired
Penalties assessed
$0
EPA programs this record is registered in
ProgramProgram IDsPermit / classificationCompliance statusQuarters in non-complianceActions, formal / informal
Clean Water Act (NPDES)TXR05EJ95 ↗
TXR15599T ↗
Non-MNo Violation Identified0 quarters—

Releases & emissionsEPA Toxics Release Inventory (Form R)

Does not report to TRI.

    Off-site transfersEPA Toxics Release Inventory (Form R)

    No TRI off-site transfers reported.

      Hazardous wasteEPA RCRA Biennial Report, e-Manifest

      No RCRA Biennial Report or e-Manifest activity.

        Compliance & enforcementEPA ECHO, RCRAInfo · status as of 2026-11-01

        ECHO lists no current violations at the snapshot. Last inspected 2022-07-11.

        Compliance quarter by quarter Each box is one quarter, oldest on the left, ending at the snapshot (2026-11-01): _ no violation identified V violation S significant violation
        110070595972CWA_____________
        110070389315CWA_____________

        Details

        Compliance summary for each EPA record2 rows
        Registry IDCompliance statusSignificant non-complierFormal actionsInformal actionsPenaltiesInspectionsLast inspection
        110070595972No Violation IdentifiedNo0 actions0 actions$01 inspection2022-07-11
        110070389315No Violation IdentifiedNo0 actions0 actions$00 inspections—
        • No RCRA inspections, violations, or enforcement actions on record.

        Source datasnapshot 2026-11-01

        Snapshot 20261101_090957, refreshed 2026-11-01. Each dataset is as current as EPA's own file:

        Figures can differ from EPA's live portals where EPA has updated its data since then. Each EPA record's Detailed Facility Report is linked under Identity & operations.

        Rolling updates

        Scheduled AI sweeps of public sources find the stage, deadlines, and sources below, and an AI writes the summary from them. They may not be comprehensive. Check the linked sources before relying on any of it. About the data

        Summary from the latest report mention, AI-written

        Stage Idle Inferred from a news reportReasoning: Oil & Gas Watch reports the Tyler pyrolysis plant, which processed plastic, stopped operating in summer 2024 and its CEO called it mothballed; no permanent closure is reported.Oil & Gas Watch News: Despite big growth plans, chemical plastics recycling plant in East Texas unexpectedly stops operating ↗Recorded in report 2026-10-22-sweep

        • Gap check (registry row with no sweep data). Oil & Gas Watch brief of 2024-10-29: the Trinity Oaks Tyler plastics pyrolysis plant, processing 50 tons of plastic per day, was 'mothballed' in summer 2024 per CEO Rusty Combs. The planned expansion to 500 tons per day (Lummus New Hope technology; S&B contractor) would go at the same site or elsewhere on the Gulf Coast, no details. TotalEnergies offtake commitment of 100,000 tons per year. Backfill: no 2026 permit action or news found.
        • TCEQ pending NSR list read in full 2026-10-22 (via proxy): no New Hope entry. Restart or expansion status in 2026 unconfirmed.

        From report 2026-10-22-sweep

        Open deadlines

        None found.

        Sources (1) AI-found

        Date foundKindTitleNoteReport
        2026-10-22newsOil & Gas Watch News: Despite big growth plans, chemical plastics recycling plant in East Texas unexpectedly stops operatingBACKFILL - dated 2024-10-29. Plant mothballed summer 2024; 50 TPD; expansion to 500 TPD on hold. First status entry for this registry facility.2026-10-22-sweep