Facilities / ExxonMobil Baytown advanced recycling (pyrolysis) units
ExxonMobil Baytown advanced recycling (pyrolysis) units
AI-found Facility identity not yet checked by an admin.
Facility info
| Field | Value | Source |
|---|---|---|
| Location | Baytown, Harris County, TX | Show where Location was foundInferred from an agency recordReasoning: The TCEQ notice locates the Baytown Chemical Plant at 5000 Bayway Dr, Baytown, Harris County, Texas.TCEQ Notice of Application and Preliminary Decision: Air Quality Permit 20211, ExxonMobil Baytown Chemical Plant (amendment and renewal) ↗Recorded in report 2026-10-15-sweep |
| Operator | Exxon Mobil Corporation | Show where Operator was foundInferred from an agency recordReasoning: The TCEQ notice names the applicant as Exxon Mobil Corporation for Air Quality Permit 20211 at the Baytown Chemical Plant.TCEQ Notice of Application and Preliminary Decision: Air Quality Permit 20211, ExxonMobil Baytown Chemical Plant (amendment and renewal) ↗Recorded in report 2026-10-15-sweep |
| Facility type | pyrolysis | Show where Facility type was foundInferred from a news reportReasoning: C&EN reports ExxonMobil has started up three pyrolysis units at its Baytown, Texas, refining and petrochemical complex.C&EN: With recycling plants closing, is plastic pyrolysis worth saving? (2026-09-30) ↗Recorded in report 2026-10-05-watchlist |
| Stage | Operating | Show where Stage was foundInferred from a news reportReasoning: C&EN reports three Baytown pyrolysis units started up and about 70,000 t of waste processed since the first unit opened in 2022.C&EN: With recycling plants closing, is plastic pyrolysis worth saving? (2026-09-30) ↗Recorded in report 2026-10-05-watchlist |
| First report mention | 2026-10-05 | Show the report that first mentioned this facilityA scheduled AI sweep first mentioned this facility in this report.Recorded in report 2026-10-05-watchlist |
EPA values come from the EPA snapshot 20261101_090957 and are shown in place of anything an AI sweep reported for the same field. AI-found values were found in public sources by scheduled AI sweeps; the token opens where the value was found: the passage quoted from the source or the reasoning behind the value, the source, and the report that recorded it. Quotes are copied by the AI and not yet checked against their sources.
Published data
No EPA records are linked to this facility yet: the facility registry has no EPA registry id for it.
Rolling updates
Scheduled AI sweeps of public sources find the stage, deadlines, and sources below, and an AI writes the summary from them. They may not be comprehensive. Check the linked sources before relying on any of it. About the data
Check for yourself: TCEQ pending air permit applications (Air permits only) · EPA ECHO facility search · Federal Register · Regulations.gov
Summary from the latest report mention, AI-written
Stage Operating Show where Stage was foundInferred from a news reportReasoning: C&EN reports three Baytown pyrolysis units started up and about 70,000 t of waste processed since the first unit opened in 2022.C&EN: With recycling plants closing, is plastic pyrolysis worth saving? (2026-09-30) ↗Recorded in report 2026-10-05-watchlist
- C&EN (2026-09-30), quoting ExxonMobil [company statement in news]: three pyrolysis units started at the Baytown complex since 2021, with 110,000 t/yr of plastics-processing capacity in total. A fourth unit is planned by year-end 2026, which would bring capacity to 200,000 t/yr. About 70,000 t of waste processed since the first unit opened in 2022.
- Lux Research (in C&EN) says the first unit ran at about 50% of capacity over its first two years. Feedstock is pre-sorted, processed regrind and repro from suppliers such as Triton Group, not raw bales.
- No permit record for the fourth unit has been located. TCEQ's pending NSR list has no date column (Channel Map note, 2026-10-04), so check TCEQ Permit Search by the Baytown site's regulated-entity number.
- TCEQ pending NSR item 'EXXON MOBIL CORPORATION | BAYTOWN CHEMICAL PLANT | 20211' identified (2026-10-15): the bilingual notice (NAPD) is for 'an amendment to and renewal of Air Quality Permit Number 20211, which would authorize modification to and continued operation of the Baytown Chemical Plant at 5000 Bayway Dr', application 'submitted to the TCEQ on December 23, 2016', 'Notice Issuance Date: December 19, 2025' (project 263116). It does not mention pyrolysis, Exxtend or plastic feedstock, so it is not shown to cover the fourth unit. Comment window ran 30 days from newspaper publication (date not captured). Contact Thomas Wauhob, (254) 545-0804; file copy at Sterling Municipal Library, Baytown.
From report 2026-10-15-sweep
Open deadlines
None found.
Sources (2) AI-found
| Date found | Kind | Title | Note | Report |
|---|---|---|---|---|
| 2026-10-15 | agency | TCEQ Notice of Application and Preliminary Decision: Air Quality Permit 20211, ExxonMobil Baytown Chemical Plant (amendment and renewal) | Site-wide flexible-permit amendment/renewal, applied 2016-12-23, notice issued 2025-12-19. No pyrolysis language; settles the 10-11 open question but does not locate a permit for the fourth unit. | 2026-10-15-sweep |
| 2026-10-05 | news | C&EN: With recycling plants closing, is plastic pyrolysis worth saving? (2026-09-30) | Capacity, fourth-unit timing, and throughput are ExxonMobil statements (Eloissa Wells) reported by C&EN; not agency-confirmed. Company page for third unit: https://corporate.exxonmobil.com/locations/united-states/baytown/newsroom/2026/baytown-becoming-one-of-the-largest-advanced-recycling-operations | 2026-10-05-watchlist |